Earned Value4.0 - App Store

Please wait ... The app listing is being verified for availability.
You'll be able to see results in few seconds.


Publisher Description

More than 50 articles, 19 lessons, 70 test questions, 70 pictures. Easy to learn manual on Earned Value Method.

A unique educational application that provides all the knowledge about Earned Value Methods needed to pass the exam on project management IPMA level C and D, PMP, and PRINCE 2 Foundation and allows you to test it thoroughly. It is also covered by some MBA and post degree studies.

Knowledge is divided into small, easily to read components. You can plan your study and tests, where and when you need it: on the bus, at a boring meeting, watching TV, in a traffic jam. In addition, we have prepared several lessons that group articles, questions and tests controls in a logical sequence on a given topic.

Your progress is measured points of knowledge. Do you know where you are and what you are missing. Collect up to 500 points of knowledge. You lack the perseverance to learn? With our application you will not even notice when you have mastered all the knowledge about Earned Value Method.

Convenient user interface provides pleasant reading. Zoom, scroll, search, add to favorites, and more.

This is LITE release! It is still being updated with content.

Main features:

** Knowledge of Earned Value Method

** You learn where you want, when you want

** The logical structure of lessons divided into thematic categories

** Continuous updates of articles, lessons and tests available automatically from your smartphone or tablet

** A revolutionary approach to learning: reading, verification of acquired knowledge, testing

** Lessons, articles and tests prepared by certified PgMP, PMP, PRINCE2 holders

** Automatic synchronization of content directly to your smartphone or tablet, but you do not have to be connected to the Internet to read the downloaded content

** Full-text search of all the content

** Knowledge divided into categories

The aim is to fully cover the competence of the project manager listed in the IPMA NCB of Earned Value Method. Current state - 50% of planned content.

Users of this version of the application Octigo - EVM have the right to a free and perpetual download of current content from our server.

Disclaimer:

Octigo, the publisher of this product, is not affiiliated with by any organization. All organizational names are trademarks of Their respective owners. The content of the application might include inaccuracies or typographical errors, for Which the owner can not be held liable.

Help Us Improve

We value your feedback please share your feedback with us to make our apps better. If you have any topic which you want us to cover in future apps, write to us at szkolenia@octigo.pl

Requires iOS 4.3 or later. Compatible with iPhone, iPad, and iPod touch.



About Earned Value

Earned Value is a free app for iOS published in the Office Suites & Tools list of apps, part of Business.

The company that develops Earned Value is Octigo. The latest version released by its developer is 4.0.

To install Earned Value on your iOS device, just click the green Continue To App button above to start the installation process. The app is listed on our website since 2013-08-27 and was downloaded 0 times. We have already checked if the download link is safe, however for your own protection we recommend that you scan the downloaded app with your antivirus. Your antivirus may detect the Earned Value as malware if the download link is broken.

How to install Earned Value on your iOS device:

  • Click on the Continue To App button on our website. This will redirect you to the App Store.
  • Once the Earned Value is shown in the iTunes listing of your iOS device, you can start its download and installation. Tap on the GET button to the right of the app to start downloading it.
  • If you are not logged-in the iOS appstore app, you'll be prompted for your your Apple ID and/or password.
  • After Earned Value is downloaded, you'll see an INSTALL button to the right. Tap on it to start the actual installation of the iOS app.
  • Once installation is finished you can tap on the OPEN button to start it. Its icon will also be added to your device home screen.

Program Details


General

Publisher
Released Date
2013-08-27
Languages
English

Category

Category
Subcategory

System requirements

Operating systems
iOS

Download information

File size
13.4 MB
Total downloads
0

Pricing

License model
Free
Price

Version History


Here you can find the changelog of Earned Value since it was posted on our website on 2016-10-02.The latest version is 4.0 and it was updated on Apps112 on 04 November, 2026.See below the changes in each version:

version 4.0

posted on 2013-08-27

Disclaimer


Official App Store Link


We do not host Earned Value on our servers. We did not scan it for viruses, adware, spyware or other type of malware. This app is hosted by Apple and passed their terms and conditions to be listed there. We recommend caution when installing it.

The App Store link for Earned Value is provided to you by apps112.com without any warranties, representations or guarantees of any kind, so access it at your own risk.

If you have questions regarding this particular app contact the publisher directly. For questions about the functionalities of apps112.com contact us.





Click stars to rate this APP!

Users Rating:
  0.0/5     0
Downloads: 0
Updated At: 2026-11-04
Publisher: Octigo
Operating System: iOS
License Type: Free

TOP DOWNLOADS
in Business last week